Daily summary The day's site activity focused on Plastering work, Skim coat work, and Concrete casting work across 22 work areas, supported by Lantai Granit, Pembersihan Area Kerja, and Work item needs review.
Work by area Work area 01 · page 1 of 2 Unit A lobi
Standard area
Unit A lobi 4 entries on this page Concrete casting work
Affan Awang Fatta Fian Ropek Wafi
Concrete casting work Affan Unit A lobi
Concrete casting work Awang Unit A lobi
Concrete casting work Fatta Unit A lobi
Concrete casting work Fian Unit A lobi
Work by area Work area 01 · page 2 of 2 Unit A lobi
Standard area
Unit A lobi 2 entries on this page Concrete casting work Ropek Unit A lobi
Work by area Work area 02 · page 1 of 2 Unit A facade
Standard area
Unit A facade 4 entries on this page Plastering work
Bambang Fery Hosnan Miskat Yayan
Plastering work Bambang Unit A facade
Work by area Work area 02 · page 2 of 2 Unit A facade
Standard area
Unit A facade 1 entry on this page Plastering work Yayan Unit A facade
Work by area Work area 03 · page 1 of 2 Unit B Third Floor
Standard area
Unit B Third Floor 4 entries on this page Concrete casting work Lantai Granit Skim coat work Work item needs review
Ari Dhoni Imron Toni Wahid
Lantai Granit Ari Unit B Third Floor
Work by area Work area 03 · page 2 of 2 Unit B Third Floor
Standard area
Unit B Third Floor 1 entry on this page Work item needs review Wahid Unit B Third Floor
Work by area Work area 04 Unit A lobi Second Floor
Standard area
Unit A lobi Second Floor 4 entries on this page Lightweight brick installation Plastering work
Hakik Muzaki Riswan Topik
Plastering work Hakik Unit A lobi Second Floor
Work by area Work area 05 Unit B Second Floor
Standard area
Unit B Second Floor 4 entries on this page Lantai Granit Skim coat work
Al Halim Naim Ridho
Lantai Granit Al Unit B Second Floor
Work by area Work area 06 Unit C Third Floor
Standard area
Unit C Third Floor 4 entries on this page Lantai Granit Pembersihan Area Kerja Skim coat work
Andri Dulbari Hoirul Pak Farel
Lantai Granit Andri Unit C Third Floor
Work by area Work area 07 Building C · Rooftop Floor
Standard area
Building C · Rooftop Floor 2 entries on this page Pembersihan Area Kerja
Rian suarji
Pembersihan Area Kerja Rian Building C · Rooftop Floor
Work by area Work area 08 Unit A Room 30
Standard area
Unit A Room 30 2 entries on this page Plastering work
Yusuf Zaini A
Plastering work Yusuf Unit A Room 30
Work by area Work area 09 Unit B Room 17
Standard area
Unit B Room 17 2 entries on this page Lantai Granit
Adip Dofir
Lantai Granit Adip Unit B Room 17
Work by area Work area 10 Unit C basement
Standard area
Unit C basement 2 entries on this page Skim coat work Work item needs review
Huri Pranata
Work item needs review Huri Unit C basement
Work by area Work area 11 Unit C Room 14
Standard area
Unit C Room 14 2 entries on this page Work item needs review
Pawait Soleh
Work item needs review Pawait Unit C Room 14
Work by area Work area 12 Area not filled
Standard area
Area not filled 1 entry on this page Belanja / Logistik Site
Faisal
Belanja / Logistik Site Faisal Area not filled
Work by area Work area 13 Kolam pagar air mancur
Standard area
Kolam pagar air mancur 1 entry on this page Plastering work
Zaeni
Plastering work Zaeni Kolam pagar air mancur
Work by area Work area 14 Unit A Room 20
Standard area
Unit A Room 20 1 entry on this page Natural stone installation
Muhammad
Natural stone installation Muhammad Unit A Room 20
Work by area Work area 15 Unit B
Standard area
Unit B 1 entry on this page Pembersihan Area Kerja
Subawi
Pembersihan Area Kerja Subawi Unit B
Work by area Work area 16 Unit B facade
Standard area
Unit B facade 1 entry on this page Skim coat work
Wahyu
Skim coat work Wahyu Unit B facade
Work by area Work area 17 Unit B tangga belakang
Standard area
Unit B tangga belakang 1 entry on this page Skim coat work
Tormudi
Skim coat work Tormudi Unit B tangga belakang
Work by area Work area 18 Unit B tangga Second Floor
Standard area
Unit B tangga Second Floor 1 entry on this page Lantai Granit
Afis
Lantai Granit Afis Unit B tangga Second Floor
Work by area Work area 19 Unit C depan office
Standard area
Unit C depan office 1 entry on this page Tile installation
Sam
Tile installation Sam Unit C depan office
Work by area Work area 20 Unit C Room 15
Standard area
Unit C Room 15 1 entry on this page Tile installation
Hanan
Tile installation Hanan Unit C Room 15
Work by area Work area 21 Unit C Room 26
Standard area
Unit C Room 26 1 entry on this page Tile installation
Bais
Tile installation Bais Unit C Room 26
Work by area Work area 22 Unit C tangga Room 23
Standard area
Unit C tangga Room 23 1 entry on this page Skim coat work
Gazali
Skim coat work Gazali Unit C tangga Room 23
Standard check and completeness Work item does not match standard naming yet 4 entries The field description does not match project knowledge or BOQ/RAB finance records strongly enough yet.
Area belum diisi 1 entry Lokasi belum ditulis oleh team lapangan.
Area does not meet report standards yet 1 entry The site input does not mention a work area, so it is not used as a final progress conclusion by area.