Daily summary The day's site activity focused on Plastering work, Work item needs review, and Lantai Granit across 25 work areas, supported by Lightweight brick installation, Skim coat work, and Pembersihan Area Kerja.
Work by area Work area 01 · page 1 of 2 Unit B Third Floor
Standard area
Unit B Third Floor 4 entries on this page Lantai Granit Plastering work Work item needs review
Affan Andri Ari Dani Imron Sam Tormudi
Work item needs review Affan Unit B Third Floor
Lantai Granit Andri Unit B Third Floor
Lantai Granit Ari Unit B Third Floor
Work item needs review Dani Unit B Third Floor
Work by area Work area 01 · page 2 of 2 Unit B Third Floor
Standard area
Unit B Third Floor 3 entries on this page Lantai Granit Imron Unit B Third Floor
Work by area Work area 02 · page 1 of 2 Unit A lobi
Standard area
Unit A lobi 4 entries on this page Lightweight brick installation Pembersihan Area Kerja Work item needs review
Al Ropek Subawi Yusuf rizal
Work item needs review Al Unit A lobi
Work by area Work area 02 · page 2 of 2 Unit A lobi
Standard area
Unit A lobi 1 entry on this page Lightweight brick installation rizal Unit A lobi
Work by area Work area 03 Unit A lobi Second Floor
Standard area
Unit A lobi Second Floor 4 entries on this page Lightweight brick installation
Adip Muzaki Riswan Topik
Lightweight brick installation Adip Unit A lobi Second Floor
Work by area Work area 04 Unit A
Standard area
Unit A 3 entries on this page Work item needs review
Fatta Fian Wafi
Work item needs review Fatta Unit A
Work by area Work area 05 Unit C basement
Standard area
Unit C basement 3 entries on this page Skim coat work Work item needs review
Akseh Huri Pranata
Work item needs review Akseh Unit C basement
Work by area Work area 06 Unit C Room 14
Standard area
Unit C Room 14 3 entries on this page Tile installation Work item needs review
Anang Pawait Soleh
Tile installation Anang Unit C Room 14
Work by area Work area 07 Kolam pagar air mancur
Standard area
Kolam pagar air mancur 2 entries on this page Plastering work
Gazali Hakik
Plastering work Gazali Kolam pagar air mancur
Work by area Work area 08 Unit A Room 30
Standard area
Unit A Room 30 2 entries on this page Lightweight brick installation
Zaeni Zaini A
Lightweight brick installation Zaeni Unit A Room 30
Work by area Work area 09 Unit A Second Floor
Standard area
Unit A Second Floor 2 entries on this page Skim coat work
Miskat Yayan
Skim coat work Miskat Unit A Second Floor
Work by area Work area 10 Unit A rooftop
Standard area
Unit A rooftop 2 entries on this page Plastering work
Awang Dhoni
Plastering work Awang Unit A rooftop
Work by area Work area 11 Unit B facade
Standard area
Unit B facade 2 entries on this page Plastering work Skim coat work
Naim Ridho
Plastering work Naim Unit B facade
Work by area Work area 12 Unit B Room 17
Standard area
Unit B Room 17 2 entries on this page Pembersihan Area Kerja
Munir Pak Farel
Pembersihan Area Kerja Munir Unit B Room 17
Work by area Work area 13 Unit B Room 18
Standard area
Unit B Room 18 2 entries on this page Concrete casting work Lantai Granit
Dulbari Hanan
Concrete casting work Dulbari Unit B Room 18
Work by area Work area 14 Unit B rooftop
Standard area
Unit B rooftop 2 entries on this page Skim coat work
Toni Wahid
Skim coat work Toni Unit B rooftop
Work by area Work area 15 Unit C Third Floor
Standard area
Unit C Third Floor 2 entries on this page Pembersihan Area Kerja Skim coat work
Hoirul suarji
Skim coat work Hoirul Unit C Third Floor
Work by area Work area 16 Area not filled
Standard area
Area not filled 1 entry on this page Belanja / Logistik Site
Faisal
Belanja / Logistik Site Faisal Area not filled
Work by area Work area 17 Building C · Rooftop Floor
Standard area
Building C · Rooftop Floor 1 entry on this page Lantai Granit
Rian
Lantai Granit Rian Building C · Rooftop Floor
Work by area Work area 18 Unit A belakang
Standard area
Unit A belakang 1 entry on this page Plastering work
Fery
Plastering work Fery Unit A belakang
Work by area Work area 19 Unit A facade
Standard area
Unit A facade 1 entry on this page Plastering work
Hosnan
Plastering work Hosnan Unit A facade
Work by area Work area 20 Unit A facade Third Floor
Standard area
Unit A facade Third Floor 1 entry on this page Plastering work
Bambang
Plastering work Bambang Unit A facade Third Floor
Work by area Work area 21 Unit A pagar air mancur
Standard area
Unit A pagar air mancur 1 entry on this page Plastering work
Afis
Plastering work Afis Unit A pagar air mancur
Work by area Work area 22 Unit B facade Second Floor
Standard area
Unit B facade Second Floor 1 entry on this page Plastering work
Halim
Plastering work Halim Unit B facade Second Floor
Work by area Work area 23 Unit B facade Third Floor
Standard area
Unit B facade Third Floor 1 entry on this page Skim coat work
Wahyu
Skim coat work Wahyu Unit B facade Third Floor
Work by area Work area 24 Unit B tangga belakang
Standard area
Unit B tangga belakang 1 entry on this page Lantai Granit
Dofir
Lantai Granit Dofir Unit B tangga belakang
Work by area Work area 25 Unit C Room 25
Standard area
Unit C Room 25 1 entry on this page Lantai Granit
Bais
Lantai Granit Bais Unit C Room 25
Standard check and completeness Work item does not match standard naming yet 11 entries The field description does not match project knowledge or BOQ/RAB finance records strongly enough yet.
Area belum diisi 1 entry Lokasi belum ditulis oleh team lapangan.
Area does not meet report standards yet 1 entry The site input does not mention a work area, so it is not used as a final progress conclusion by area.