Daily summary The day's site activity focused on Work item needs review, Plastering work, and Lantai Granit across 22 work areas, supported by Skim coat work, Pembersihan Area Kerja, and Rebar work.
Work by area Work area 01 · page 1 of 3 Unit B Third Floor
Standard area
Unit B Third Floor 4 entries on this page Chipping work Lantai Granit Plastering work Work item needs review
Ari Dulbari Halim Huri Imron Ridho Riswan Sei Toni Wahid rizal
Lantai Granit Ari Unit B Third Floor
Work item needs review Dulbari Unit B Third Floor
Plastering work Halim Unit B Third Floor
Work item needs review Huri Unit B Third Floor
Work by area Work area 01 · page 2 of 3 Unit B Third Floor
Standard area
Unit B Third Floor 4 entries on this page Lantai Granit Imron Unit B Third Floor
Work by area Work area 01 · page 3 of 3 Unit B Third Floor
Standard area
Unit B Third Floor 3 entries on this page Work item needs review Toni Unit B Third Floor
Work by area Work area 02 · page 1 of 3 Unit A lobi
Standard area
Unit A lobi 4 entries on this page Pembersihan Area Kerja Plastering work Work item needs review
Adip Affan Al Cipto Fatta Fian Subawi Topik Wafi Yusuf
Plastering work Adip Unit A lobi
Work by area Work area 02 · page 2 of 3 Unit A lobi
Standard area
Unit A lobi 4 entries on this page Work item needs review Fatta Unit A lobi
Work by area Work area 02 · page 3 of 3 Unit A lobi
Standard area
Unit A lobi 2 entries on this page Work item needs review Wafi Unit A lobi
Work by area Work area 03 Kolam pagar air mancur
Standard area
Kolam pagar air mancur 4 entries on this page Plastering work
Bambang Fery Gazali Hakik
Plastering work Bambang Kolam pagar air mancur
Work by area Work area 04 Unit B Room 18
Standard area
Unit B Room 18 4 entries on this page Dinding Granit Kamar mandi Lantai Granit
Abdullah Anang Gani Wiwin
Lantai Granit Abdullah Unit B Room 18
Work by area Work area 05 Unit C Room 14
Standard area
Unit C Room 14 4 entries on this page Lantai Granit Work item needs review
Andri Pawait Sam Soleh
Lantai Granit Andri Unit C Room 14
Work by area Work area 06 Building C · Rooftop Floor
Standard area
Building C · Rooftop Floor 3 entries on this page Lantai Granit Skim coat work Work item needs review
Hoirul Rian suarji
Skim coat work Hoirul Building C · Rooftop Floor
Work by area Work area 07 Unit C basement
Standard area
Unit C basement 3 entries on this page Concrete casting work Rebar work Skim coat work
Pranata Syaiful Zaeni
Skim coat work Pranata Unit C basement
Work by area Work area 08 Unit A Second Floor
Standard area
Unit A Second Floor 2 entries on this page Skim coat work
Wahyu Yayan
Skim coat work Wahyu Unit A Second Floor
Work by area Work area 09 Unit B Room 17
Standard area
Unit B Room 17 2 entries on this page Lantai Granit
Dofir Hanan
Lantai Granit Dofir Unit B Room 17
Work by area Work area 10 Unit B Third Floor facade
Standard area
Unit B Third Floor facade 2 entries on this page Rebar work
Akseh Ropek
Rebar work Akseh Unit B Third Floor facade
Work by area Work area 11 Unit C Third Floor
Standard area
Unit C Third Floor 2 entries on this page Work item needs review
Awang Dhoni
Work item needs review Awang Unit C Third Floor
Work by area Work area 12 Area not filled
Standard area
Area not filled 1 entry on this page Belanja / Logistik Site
Faisal
Belanja / Logistik Site Faisal Area not filled
Work by area Work area 13 Unit A belakang
Standard area
Unit A belakang 1 entry on this page Skim coat work
Hosnan
Skim coat work Hosnan Unit A belakang
Work by area Work area 14 Unit A Room 17
Standard area
Unit A Room 17 1 entry on this page Pembersihan Area Kerja
Muhammad
Pembersihan Area Kerja Muhammad Unit A Room 17
Work by area Work area 15 Unit A Second Floor belakang
Standard area
Unit A Second Floor belakang 1 entry on this page Skim coat work
Miskat
Skim coat work Miskat Unit A Second Floor belakang
Work by area Work area 16 Unit B belakang
Standard area
Unit B belakang 1 entry on this page Skim coat work
Tormudi
Skim coat work Tormudi Unit B belakang
Work by area Work area 17 Unit B Second Floor
Standard area
Unit B Second Floor 1 entry on this page Plastering work
Joko
Plastering work Joko Unit B Second Floor
Work by area Work area 18 Unit B Second Floor belakang
Standard area
Unit B Second Floor belakang 1 entry on this page Plastering work
Mistun
Plastering work Mistun Unit B Second Floor belakang
Work by area Work area 19 Unit B per Unit
Standard area
Unit B per Unit 1 entry on this page Pembersihan Area Kerja
Pak Farel
Pembersihan Area Kerja Pak Farel Unit B per Unit
Work by area Work area 20 Unit C Room 16
Standard area
Unit C Room 16 1 entry on this page Pembersihan Area Kerja
Munir
Pembersihan Area Kerja Munir Unit C Room 16
Work by area Work area 21 Unit C Room 25
Standard area
Unit C Room 25 1 entry on this page Lantai Granit
Bais
Lantai Granit Bais Unit C Room 25
Work by area Work area 22 Unit C Room 26
Standard area
Unit C Room 26 1 entry on this page Work item needs review
Dani
Work item needs review Dani Unit C Room 26
Standard check and completeness Work item does not match standard naming yet 18 entries The field description does not match project knowledge or BOQ/RAB finance records strongly enough yet.
Area belum diisi 1 entry Lokasi belum ditulis oleh team lapangan.
Area does not meet report standards yet 1 entry The site input does not mention a work area, so it is not used as a final progress conclusion by area.