Daily summary The day's site activity focused on Skim coat work, Lantai Granit, and Plastering work across 24 work areas, supported by Ground leveling work, Cor Plat Lantai, and Work item needs review.
Work by area Work area 01 · page 1 of 2 Unit A lobi
Standard area
Unit A lobi 4 entries on this page Concrete casting work Cor Plat Lantai Work item needs review
Affan Huri Naim Tohari Toni Wahid Zaini
Concrete casting work Affan Unit A lobi
Cor Plat Lantai Huri Unit A lobi
Work item needs review Naim Unit A lobi
Cor Plat Lantai Tohari Unit A lobi
Work by area Work area 01 · page 2 of 2 Unit A lobi
Standard area
Unit A lobi 3 entries on this page Concrete casting work Toni Unit A lobi
Work by area Work area 02 Unit A
Standard area
Unit A 4 entries on this page Ground leveling work Plastering work
Fian Peni Rival Wafi
Ground leveling work Fian Unit A
Work by area Work area 03 Unit A Third Floor
Standard area
Unit A Third Floor 4 entries on this page Skim coat work
Bambang Fendi Hosnan Ridho
Skim coat work Bambang Unit A Third Floor
Work by area Work area 04 Unit B belakang
Standard area
Unit B belakang 4 entries on this page Plastering work Skim coat work
Dulbari Parman Ropek Topik
Plastering work Dulbari Unit B belakang
Work by area Work area 05 Unit C tangga ujung
Standard area
Unit C tangga ujung 4 entries on this page Concrete casting work Lantai Granit Lightweight brick installation
Abdullah Muzaki Wiwin Zaeni
Lantai Granit Abdullah Unit C tangga ujung
Work by area Work area 06 Unit A samping lobi
Standard area
Unit A samping lobi 3 entries on this page Ground leveling work Plastering work
Fatta Joko Mistun
Ground leveling work Fatta Unit A samping lobi
Work by area Work area 07 Unit B Third Floor
Standard area
Unit B Third Floor 3 entries on this page Plastering work Skim coat work
Dani Farel Waffa
Plastering work Dani Unit B Third Floor
Work by area Work area 08 Unit A belakang
Standard area
Unit A belakang 2 entries on this page Skim coat work
Pranata Yayan
Skim coat work Pranata Unit A belakang
Work by area Work area 09 Unit A Second Floor
Standard area
Unit A Second Floor 2 entries on this page Skim coat work
Fery Miskat
Skim coat work Fery Unit A Second Floor
Work by area Work area 10 Unit C basement
Standard area
Unit C basement 2 entries on this page Ground leveling work Rebar work
Yusuf rizal
Ground leveling work Yusuf Unit C basement
Work by area Work area 11 Unit C Room 14
Standard area
Unit C Room 14 2 entries on this page Work item needs review
Pawait Ramli
Work item needs review Pawait Unit C Room 14
Work by area Work area 12 Unit C Room 22
Standard area
Unit C Room 22 2 entries on this page Lantai Granit
Ari Hafiz
Lantai Granit Ari Unit C Room 22
Work by area Work area 13 Area not filled
Standard area
Area not filled 1 entry on this page Belanja / Logistik Site
Faisal
Belanja / Logistik Site Faisal Area not filled
Work by area Work area 14 Area proyek
Standard area
Area proyek 1 entry on this page Pembersihan Area Kerja
Pak Farel
Pembersihan Area Kerja Pak Farel Area proyek
Work by area Work area 15 Building C · Rooftop Floor
Standard area
Building C · Rooftop Floor 1 entry on this page Skim coat work
Hakik
Skim coat work Hakik Building C · Rooftop Floor
Work by area Work area 16 Unit A Room 19
Standard area
Unit A Room 19 1 entry on this page Pembersihan Area Kerja
Muhammad
Pembersihan Area Kerja Muhammad Unit A Room 19
Work by area Work area 17 Unit A Room 20
Standard area
Unit A Room 20 1 entry on this page Pembersihan Area Kerja
Rahul
Pembersihan Area Kerja Rahul Unit A Room 20
Work by area Work area 18 Unit B
Standard area
Unit B 1 entry on this page Work item needs review
Subawi
Work item needs review Subawi Unit B
Work by area Work area 19 Unit B tangga Room 17
Standard area
Unit B tangga Room 17 1 entry on this page Lantai Granit
Adip
Lantai Granit Adip Unit B tangga Room 17
Work by area Work area 20 Unit C Room 13
Standard area
Unit C Room 13 1 entry on this page Lantai Granit
Redi
Lantai Granit Redi Unit C Room 13
Work by area Work area 21 Unit C Room 16
Standard area
Unit C Room 16 1 entry on this page Lantai Granit
Sam
Lantai Granit Sam Unit C Room 16
Work by area Work area 22 Unit C Room 25
Standard area
Unit C Room 25 1 entry on this page Lantai Granit
Bais
Lantai Granit Bais Unit C Room 25
Work by area Work area 23 Unit C tangga Room 13
Standard area
Unit C tangga Room 13 1 entry on this page Lantai Granit
Lobi
Lantai Granit Lobi Unit C tangga Room 13
Work by area Work area 24 Unit C tangga Room 15
Standard area
Unit C tangga Room 15 1 entry on this page Lantai Granit
Andri
Lantai Granit Andri Unit C tangga Room 15
Standard check and completeness Work item does not match standard naming yet 4 entries The field description does not match project knowledge or BOQ/RAB finance records strongly enough yet.
Area belum diisi 1 entry Lokasi belum ditulis oleh team lapangan.
Area does not meet report standards yet 1 entry The site input does not mention a work area, so it is not used as a final progress conclusion by area.